Skip to main content
NL
EN
search
Legislation
Finance
Infrastructure
Marine Researchgroups
Publications
Graphs
Google
Coastal portal
Publications
News
Contact
About
You are here
Home
» IMIS - Marine Research Groups
IMIS - Marine Research Groups
[ report an error in this record ]
Nautische toegankelijkheid Sluis Harelbeke (eindfase)
Info
Abstract
Institutes
(2)
Publication
Funder identifier
: WL 18_155 (Other contract id)
Period:
December 2018 till May 2020
Status
: Completed
Thesaurus terms
Fairway and harbour design; Hydraulic structures; Locks (Waterways); Marine engineering; Modelling and simulation; River engineering; Simulations; Simulators
Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Vlaams Ministerie Mobiliteit en Openbare Werken; Departement Mobiliteit en Openbare Werken; Waterbouwkundig Laboratorium (WL)
,
more
, executant
Eloot, Katrien
, observer
Verwilligen, Jeroen
, project leader
Lemmens, Mats
Geiregat, Sven
De Vlaamse Waterweg; Afdeling Bovenschelde (ABS)
,
more
, proposer
Bepalen van de maximale stuwdebieten waarvoor de nieuwe Vb-sluis te Harelbeke toegankelijk is voor scheepsklasses Vb en Va.
Verwilligen, J.; Eloot, K.; Mostaert, F.
(2019). Nautische toegankelijkheid Sluis Harelbeke: simulatiestudie eindfase. Versie 4.0.
WL Rapporten
, 18_155_1. Waterbouwkundig Laboratorium: Antwerpen. VIII, 48 + 248 p. bijl. pp.
https://dx.doi.org/10.48607/293
,
more
Scroll To Top