Dutch title: Studie van de golfoploop en golfterugloop op een stortsteengolfbreker op basis van metingen op prototype Funder identifier: P102/01106197 (Other contract id) Period: January 1997 till February 2000 Status: Completed
Wave run-up on a breakwater or a dyke is very important with regard to the determination of the necessary height of the structure. In situ test results show a 50% higher Ru than measured in laboratory. The objective of this project is confirmation of the in situ results and a scientific explanation of the difference between laboratory results and in situ results. The expected impact on breakwater and sea-dyke design is very important.