IMIS - Marine Research Groups | Compendium Coast and Sea

IMIS - Marine Research Groups

[ report an error in this record ]basket (1): add | show Print this page

one publication added to basket [309980]
GOG-GGG Bovenzanden: dimsensionering in- en uitwateringssluizen
Coen, L.; Vercruysse, J.B.; Mostaert, F. (2019). GOG-GGG Bovenzanden: dimsensionering in- en uitwateringssluizen. versie 4.0. WL Rapporten, 18_011_1. Waterbouwkundig Laboratorium: Antwerpen. VI, 21 pp.
Part of: WL Rapporten. Waterbouwkundig Laboratorium: Antwerpen. , more

Available in  Authors 
Document type: Project report

Keywords
    Numerical modelling
    Water management > Hydraulics > Hydrodynamic models
Author keywords
    Zeeschelde; Rupel R.; Bovenzanden; 1D numeriek model; GOG, GGG

Project Top | Authors 
  • GGG Bovenzanden: dimensionering in- en uitwateringssluizen, more

Contact details

Proposer: Vlaamse overheid; Beleidsdomein Mobiliteit en Openbare Werken; Waterwegen en zeekanaal NV; Afdeling Zeeschelde, more


Authors  Top 

Abstract
    Het bestaand GOG Bovenzanden zal in het kader van het geactualiseerde Sigmaplan ingericht worden als gecontroleerd overstromingsgebied met gecontroleerd gereduceerd getij (GOG-GGG). Bij de herinrichting van het GOG zal ook de GOG-uitwatering aangepast worden. Met behulp van scenarioberekeningen in een gebiedsmodel wordt naar optimale configuratie voor de GOG-uitwatering gezocht. Ook voor de GGG inwatering wordt een gebiedsmodel gebruikt voor het bepalen van het optimale aantal GGG inwateringsluizen. Voor de aanleg van ringdijken en overloopdijken van andere GOG-gebieden zal grond gewonnen worden in Bovenzanden. De uitvoering van graafwerken in het gebied biedt de mogelijkheid om de topografie aan te passen zodat met een minimaal aantal inwateringskokers een optimale overstromingsfrequentie bekomen kan worden.

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors