IMIS - Marine Research Groups | Compendium Coast and Sea

IMIS - Marine Research Groups

[ report an error in this record ]basket (0): add | show Print this page

Preparatory investigation
Meylemans, E.; Haelterman, K.; De Beukelaer-Dossche, M.; Peeters, P. (2013). Preparatory investigation, in: De Beukelaer-Dossche, M. et al. (Ed.) Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. pp. 87-99
In: De Beukelaer-Dossche, M.; Decleyre, D. (Ed.) (2013). Bergenmeersen: construction of a Flood Control Area with Controlled Reduced Tide as part of the Sigma Plan. Waterways and Sea Canal (W&SC)/Agency for Nature and Forest (ANB): Antwerp/Brussels. ISBN 9789040303432. 136 pp., more

Available in  Authors 

Authors  Top 
  • Meylemans, E., more
  • Haelterman, K.
  • De Beukelaer-Dossche, M., more
  • Peeters, P., more

Abstract
    A great deal of preparatory investigation preceded the organizational work at Bergenmeersen. This was necessary to gain an insight into soil quality and structure and the archaeological richness of the project area, since these elements influence the design and costs of the project.This chapter describes the results of the environmental, geotechnical and geophysical soil survey and the archaeological survey. It also examines the model trials of the inlet and outlet sluices. It is through these sluices that the Scheldt water will flow into and out of the flood control area with controlled reduced tide (FCA-CRT).

All data in the Integrated Marine Information System (IMIS) is subject to the VLIZ privacy policy Top | Authors